動画検索
関連広告
検索結果
Loose gravel or ballasted materials are removed to help reduce weight on the roof prior to loading the new materials.
Perimeter warning lines or guardrails are installed around the perimeter of the roof.
New project materials and equipment are loaded on the roof and staged to evenly distribute the weight.
New insulation is installed in a staggered pattern.
Due to wind uplift, enhanced fastening patterns are used around the perimeter and corners of the roof.
Around any drains or scuppers the insulation boards may be tapered to allow enhanced drainage from the roof.
All seams are welded together and probed to ensure a watertight installation.
Parapet walls are encased with the membrane and the appropriate metal detail is installed.
Rooftop projections are flashed with the membrane to prevent water infiltration.
All installation projects are completed in sections with nightly tie-ins.