動画検索
関連広告
検索結果
Unpacking and checking accessories Open the box and check that the accessories are complete against the list.
Place the battery pedestal on the ground.
Connect the grounding in series.
Cover the terminals on both sides of the battery.
CAN communication cable connector should be made by waterproof kit
The on-grid side is on the right and back-side is on the left, please make sure the connection is correct.
Make sure the positive side is on the upper side and negative side is on the underside, (Inverter+ battery+; Inverter- battery-)
Unscrew the cover of communication port.
Battery communication to CAN port, meter communication to meter/RS485 port, then screw the cover.
After above wiring then turn on the DC switch in the inverter.
Share your videos with friends, family, and the world.
YouTube-SAJ Wrestling
2022/07/10